12-13-2018, 12:43 PM | #1 | |
Colonel
![]() 2145
Rep 2,388
Posts |
BMW and Porsche Just Beat Tesla to Three-Minute Charge With Project "FastCharge"
![]() Featured on BIMMERPOST.com https://www.bloomberg.com/news/artic...premium-europe Quote:
BMW Press Release: Jettingen-Scheppach. The industrial companies involved in the research project “FastCharge” yesterday presented the latest advancements in the field of fast and convenient energy supply for electrically powered vehicles. The prototype of a charging station with a capacity of up to 450 kW was inaugurated in Jettingen-Scheppach, Bavaria. At this ultra-fast charging station, electrically powered research vehicles created as part of the project are able to demonstrate charging times of less than three minutes for the first 100 kilometres of range or 15 minutes for a full charge (10-80 % State of Charge (SOC)). The new charging station can be used free of charge right away and is suitable for electric models of all brands with the Type 2 version of the internationally widespread Combined Charging System (CCS), as is commonly used in Europe. The research project “FastCharge” is being run by an industry consortium under the leadership of the BMW Group; its other members are Allego GmbH, Phoenix Contact E-Mobility GmbH, Dr. Ing. h. c. F. Porsche AG and Siemens AG. “FastCharge” is receiving total funding of EUR 7.8 million from the Federal Ministry of Transport and Digital Infrastructure. The implementation of the funding directives is being coordinated by NOW GmbH (National Organisation Hydrogen and Fuel Cell Technology). _________________________ Fast and convenient charging will enhance the appeal of electromobility. The increase in charging capacity up to 450 kW – between three and nine times the capacity available at DC fast-charging stations to date – enables a substantial reduction in charging times. “FastCharge” is investigating the technical requirements that need to be met in terms of both vehicles and infrastructure in order to be able to tap into these extremely high charging capacities. The basis is provided by a high-performance charging infrastructure. The Siemens energy supply system being used in the project enables researchers to test the limits of the fast-charging capacity demonstrated by vehicle batteries. It can already handle higher voltages of up to 920 volts – the level anticipated in future electrically powered vehicles. The system integrates both the high-power electronics for the charging connections as well as the communication interface to the electric vehicles. This charge controller ensures the output is automatically adapted so that different electric cars can be charged using a single infrastructure. The system’s flexible, modular architecture permits several vehicles to be charged at the same time. Thanks to high-current, high-voltage charging the system is suitable for a number of different applications, including fleet charging solutions and, as in this case, charging along highways. In order to link the system to the public power grid in Jettingen-Scheppach as part of the project, a charging container was set up with two charging connections: one provides an unprecedented charging capacity of max. 450 kW while the second can deliver up to 175 kW. Both charging stations are now available for use free of charge for all vehicles which are CCS-compatible. The Allego charging station prototypes now presented use the European Type 2 version of the well-established Combined Charging System (CCS) charging connectors. This standard has already proved successful in numerous electrically powered vehicles and is widely used internationally. In order to meet the demands of fast charging at high capacity, cooled HPC (High Power Charging) cables made by Phoenix Contact are used, which are fully CCS-compatible. The cooling fluid is an environment-friendly mixture of water and glycol, allowing the cooling circuit to be half-open. This makes maintenance comparatively straightforward as compared to hermetically sealed systems that use oil, e.g. in terms of refilling the cooling fluid. One challenge was ensuring that the cooling hoses in the charging line were not squeezed when connected to the charging station, as would happen with a conventional cable gland. In the present instance this would impair the cooling flow and therefore cooling efficiency. This problem was solved by Phoenix Contact by means of a specially developed wall duct with defined interfaces for power transmission, communication and cooling as well as integrated tension relief. Depending on the model, the new ultra-fast charging station can be used for vehicles fitted with both 400 V and 800 V battery systems. Its charging capacity automatically adapts to the maximum permitted charging capacity on the vehicle side. The time saved as a result of the increased charging capacities is demonstrated in the example of the BMW i3 research vehicle. A single 10-80 % SOC charging operation now only takes 15 minutes for the high-voltage battery, which has a net capacity of 57 kWh. This can be achieved on the vehicle side by means of a specially developed high-voltage battery combined with an intelligent charging strategy. The latter includes precise preconditioning of the storage temperature at the start of charging, temperature management during the charging operation itself and a perfectly coordinated charging capacity profile over time. The charging operation is carried out via a novel multi-voltage network on the vehicle side using a high-voltage DC/DC (HV-DC/DC) converter, transforming the required 800 V input voltage of the charging station to the lower 400 V system voltage of the BMW i3 research vehicle. The HV-DC/DC system also gives the vehicle reverse compatibility, allowing it to be charged at both old and future charging stations. A key factor in ensuring reliable operation is secure communication between the vehicle and the charging station. For this reason, standardisation issues relating to interoperability are also being investigated and submitted to standardisation bodies. The Porsche research vehicle with a net battery capacity of approx. 90 kWh achieves a charging capacity of more than 400 kW, thereby allowing charging times of less than three minutes for the first 100 km of range. |
|
12-13-2018, 01:34 PM | #2 |
Second Lieutenant
![]() 156
Rep 259
Posts |
I wouldn't really call it beating anything... They actively cooled the cables, cooled the batteries and the system has a higher discharge than current vehicles can intake. This is entirely a lab test and is not something that's usable in the real world... yet.
|
Appreciate
4
|
12-13-2018, 05:13 PM | #6 |
First Lieutenant
![]() ![]() ![]() 178
Rep 357
Posts |
There's already fast/flash charging work in place for buses in many cities: http://www.abb.com/cawp/seitp202/798...f00521b75.aspx
A few seconds and the bus gets a fast top up whilst it sets passengers down and goes onto the next stop. If smaller, lighter cars can be engineered to absorb this kind of big charge in a short period of time without manually connecting the EV it could be revolutionary. Awesome to see great engineers from the top car companies clubbing together though. It should accelerate the research and development. |
Appreciate
0
|
12-13-2018, 05:13 PM | #7 |
Second Lieutenant
![]() 218
Rep 241
Posts |
Hope batteries don't explode
|
Appreciate
2
svr2133.00 Dog Face Pony Soldier9664.00 |
12-13-2018, 05:15 PM | #8 |
Lieutenant Colonel
![]() ![]() 6473
Rep 1,966
Posts |
What kind of infrastructure will be required to support these chargers? That kind of power demand won't be supported by the current hydro capabilities. I suspect these things will be cost prohibitive for the foreseeable future.
|
Appreciate
1
SpenceRx240.00 |
12-13-2018, 05:17 PM | #9 |
Colonel
![]() ![]() 1128
Rep 2,564
Posts |
Exactly.
|
Appreciate
0
|
12-13-2018, 05:20 PM | #10 |
Colonel
![]() ![]() 1128
Rep 2,564
Posts |
Now you just need a 2000 amp service at your house.
|
Appreciate
1
Grumpy Old Man6473.00 |
12-13-2018, 05:22 PM | #11 |
Registered
2
Rep 1
Posts |
They're comparing a BMW/Porsche prototype system to a rolled out Tesla production system. Surely you should compare to Teslas prototype Megacharger system which runs at over 1MW and more than double this system?
Not sure I agree that they're ahead yet... |
Appreciate
1
Grumpy Old Man6473.00 |
12-13-2018, 05:29 PM | #12 |
Lieutenant
![]() ![]() ![]() ![]() 251
Rep 439
Posts |
This is so overblown hype. When you have a full charge everyday, it is so rare that you need to charge out and about. We’ve got 300 mile range everyday today. Not in 5 years or 3 years or however long this is going to take to roll out. And yes, when I drive it, it’s more like 200 miles per charge. But that range is available every single day.
|
Appreciate
0
|
12-13-2018, 05:37 PM | #13 |
Lieutenant Colonel
![]() ![]() 6473
Rep 1,966
Posts |
Thats what I was thinking. It's fine for your daily commute to work, providing you have the ability to charge at home. But say I want to drive to florida with my family. Thats a long haul at 200 miles a day.
|
Appreciate
1
deleted_397282_c43ae5ea84151.00 |
12-13-2018, 05:38 PM | #14 | |
#LSBM3
![]() 1432
Rep 1,973
Posts
Drives: 2016 BMW M3
Join Date: Feb 2015
Location: Oregon / Florida
iTrader: (4)
Garage List 1984 BMW R65 [0.00]
2020 Ford F-150 XLT ... [0.00] 2003 Mitsubishi Evo ... [0.00] 2016 M3 Competition ... [10.00] |
Quote:
Sounds like more of a want than a "need". I'm totally fine with my old school combustible engine and refilling with 93 octane every ~300 miles or so. Thanks!
__________________
![]() /// M3 Last edited by Brasko; 12-14-2018 at 11:12 PM.. |
|
Appreciate
5
|
12-13-2018, 05:58 PM | #15 |
drunk poster
![]() 6463
Rep 3,648
Posts |
Man, maybe BMW and Porsche can get to work on charging my phone in 3 minutes too...
|
Appreciate
1
Grumpy Old Man6473.00 |
12-13-2018, 06:03 PM | #16 |
Colonel
![]() 1280
Rep 2,032
Posts |
The worries about the availability (and performance) of the public charging infrastructure are largely a non-issue that non-EV users have been lobbied to worry about.
Over 70% of all EV users charge at home. I'm on my third EV (inc an i8) and for the past 5 years or so an EV has been the daily driver for our family. In all that time I've never even SEEN a public charging station much less used one. I know this is NOT the case for ALL EV drivers, but the vast majority just plug their cars in at home and let them charge overnight (just like a cell phone). I don't give a crap about the public charging infrastructure cause I'm not taking any road trips over 200 miles in my EV that require me to stop often or for long periods. We have an ICE powered car for that. (Most families have 2+ cars and one car can likely be an EV). Who the hell is going to stop every 62 miles to charge their car? 200+ miles range is where its at...
__________________
The Jiggery-Pokery is Strong with this One
![]() https://f80.bimmerpost.com/forums/sh....php?t=1645366 https://f80.bimmerpost.com/forums/sh....php?t=1197553 https://f80.bimmerpost.com/forums/sh...4&postcount=35 |
12-13-2018, 06:55 PM | #17 |
Major
![]() ![]() 180
Rep 1,063
Posts |
This cooperation is what the world needs!
__________________
Delivered --> '21 G01 X3 M40i, 8SA, Sunstone Metallic with Cognac Vernasca, 22Z, ZDA, ZDB, ZPK, ZPP w/ 4HA, ZPX, 2VF, 3AC, 4K1, 688, 6NW, 5DF
Past --> ?19 G01 X3 m40i, 15 F33 328xi, 8SA, '13 F30 328i, '08 E92 335xi, '95 E34 530i, '88 E30 M3 |
Appreciate
0
|
12-13-2018, 07:07 PM | #18 |
Lieutenant Colonel
![]() 1632
Rep 1,622
Posts |
This is exactly what we need. This will increase market adoption of EV technology. While most people use their EV within citi boundaries, most also have an ICE at home for 'just in case'. Having this type of technology will make nearly comparable to the ICE infrastructure.
Now what we need is Exxon or Shell to start developing a network of charging stations on a large scale comparable to gas stations. Give it another 10–15 years.
__________________
"Beware of false knowledge; it is more dangerous than ignorance."
|
Appreciate
1
atopa2002232.50 |
12-13-2018, 07:34 PM | #19 |
Lieutenant
![]() ![]() ![]() ![]() 251
Rep 439
Posts |
|
Appreciate
0
|
12-13-2018, 07:36 PM | #20 |
Brigadier General
![]() ![]() 1905
Rep 4,123
Posts
Drives: M235i & G30 540i
Join Date: Mar 2007
Location: Boynton Beach
|
Bmw and Porsche need to build a car together. This is very impressive though.
__________________
Lack of money is not the problem. It is merely a symptom of what's going on inside of you! - T Harv Eker
Follow me on Insta https://www.instagram.com/bmwm_life_/ https://www.instagram.com/autogiftua/ https://www.instagram.com/phoenixbmwlife/ ![]() |
12-13-2018, 07:49 PM | #21 |
Lieutenant
![]() ![]() ![]() 171
Rep 400
Posts |
450 kW is some serious power for batteries to take. (at least with today's Li batteries)
Just think about putting that kind of charger everywhere like gas station. Whole city needs new electric power grid. |
Appreciate
1
Grumpy Old Man6473.00 |
12-13-2018, 07:50 PM | #22 |
Lieutenant
![]() ![]() ![]() ![]() 251
Rep 439
Posts |
Fair point. I think we’re on the same page actually.
|
Appreciate
0
|
Post Reply |
Bookmarks |
|
|