09-22-2022, 12:19 AM | #1 |
Brigadier General
1997
Rep 4,028
Posts |
Are there any architects on here?
I'm going to be building a house this year and I'm having a heck of a time finding a good architect.
You've probably seen me rant before that literally nobody can do anything right in my area and I'm once again finding this to be true. I can barely get anyone to answer the phone, let alone not lose my file, remember our appointments, and I've not yet gotten even one to get to the actual next step phase. I don't want to have to beg someone repeatedly to call me back who is not eager to do the job that I'm paying them for. I'm ready to get someone out of state. Anyone on here do this for a living or know of one? |
09-22-2022, 11:48 AM | #2 |
Colonel
8090
Rep 2,508
Posts
Drives: 9Y0 Cayenne S
Join Date: Mar 2019
Location: Einbahnstraße
|
You’re contemplating to build a house in three months and haven’t engaged an architect yet? Is this the correct understanding?
In your phone conversations, have you asked, “I want to pay you for a set of plans. Are you available for this project?” Because of your tight timing, you have a general contractor engaged under contract, correct? Have you asked him/her for an architect referral? |
Appreciate
0
|
09-22-2022, 12:26 PM | #3 | |
Brigadier General
1997
Rep 4,028
Posts |
Quote:
Yes, that's exactly how I started each conversation. I've probably tried with 10+ firms and I can't get anyone to move forward. Everyone who replies says they would like to do it, but then they ghost me or forget about our appointment, etc. |
|
Appreciate
0
|
09-22-2022, 01:17 PM | #6 |
Brigadier General
12369
Rep 4,310
Posts |
Things work differently from state to state and all the firms I work with won't do anything that isn't high-rise commercial/residential unless you're willing to pay 500x the price.
Some tips that can help: 1) Find a structural engineer first and ask for a recommendation 2) Find a general contractor and ask for a recommendation 3) Drive by any development in progress and ask the foreman who the RA on the project is - you may run into a cunt but for the most part they shouldn't have a problem sharing Here are design firms in Chattanooga: https://www.surfacearch.com/ https://www.hkarchitects.net/ If you're going with any structure that isn't timber (steel, masonry, prolly not concrete but who knows) - I can help you on the structural side. Last edited by NYG; 09-22-2022 at 01:32 PM.. |
Appreciate
1
whyzee1251996.50 |
09-22-2022, 01:51 PM | #7 |
Private First Class
87
Rep 176
Posts |
We had a house plan designer do it on autocad. I drew in the beam locations and the lumber supplier had the LVL dealer look it over. He beefed it up for CYA. The bank wanted the whole package but agreed to skip electrical plans since I was doing the entire electrical. They were adamant on having house elevations.
This was in a different county. |
Appreciate
0
|
09-22-2022, 02:54 PM | #8 |
Colonel
8090
Rep 2,508
Posts
Drives: 9Y0 Cayenne S
Join Date: Mar 2019
Location: Einbahnstraße
|
whyzee125 what kind of structure are you thinking of? A garden shed or something grander?
Simple set of plans can be had on the internet. What is the reason for the architect? |
Appreciate
0
|
09-22-2022, 09:27 PM | #9 | ||
Brigadier General
1997
Rep 4,028
Posts |
Quote:
Quote:
I'm looking to build a small house (but not a tiny house) with a garage, efficient loft style interior, and a patio. I found exactly one design that exists that's perfect for my needs but the architect does not want to sell the plans and would rather design another one. I agreed but they wanted $25k to design a 700 square foot house which is absolutely insane. My parents paid $6k to have a house designed that's nearly 10 times that size. I would honestly pay $6k but not $25K, no way. |
||
Appreciate
1
chassis8089.50 |
09-22-2022, 10:38 PM | #10 | |
Captain
3906
Rep 1,003
Posts |
Quote:
|
|
Appreciate
1
whyzee1251996.50 |
09-23-2022, 11:15 AM | #11 | |
Captain
1158
Rep 910
Posts |
My friend your journey has just begun. My advice is but some comfortable shoes.
I’m Doing a 3rd floor addition. I interviewed a few architects and hired one. He flaked out. Hired a second on the recommendation of my contractor. Got the plans done and that tool 5 months. These guys are very busy at least the good ones near me. So now we filed permits, I paid and expediter and a paid for fast track with the town. It was filed first week of June 2022 and I’m still waiting. They are also swamped. Only good news is cost of goods For construction seems to be decreasing instead of increasing. Good luck. Whatever your time line double it. Whatever your budget for finishing after the build I added 30 percent to first estimate just to be safe. That’s in my wife’s control so I pretty much dead. Quote:
Last edited by jsf721; 10-02-2022 at 07:19 AM.. |
|
Appreciate
2
whyzee1251996.50 nyalpine907551.50 |
09-23-2022, 07:58 PM | #12 |
New Member
142
Rep 17
Posts |
Man, if you feel this way now, you’re in for a very large disappointment throughout every step of the process, especially if you’re a hands on kind of person
Double your timeline, budget and patience |
Appreciate
1
DETRoadster11498.50 |
09-23-2022, 08:50 PM | #13 |
Lieutenant Colonel
3523
Rep 1,754
Posts |
There's no money in residential architects. What kind of house are you looking to build? I can tell you if the house is not $4M+ you're in for a disappointment
|
Appreciate
0
|
09-23-2022, 09:28 PM | #14 | |
Space Force - 4 Star General
11499
Rep 3,265
Posts |
Quote:
My wife and I bought property a couple years back and are about 18 months into working with an architect to design our house. I've been documenting the process here if you're interested: https://f87.bimmerpost.com/forums/sh....php?t=1808634 I'd recommend against an out of state architect. You want someone who knows you're local codes and regulations. Based on your budget for an architect I'm not surprised you're having problems finding one. Typically they charge 8% to 10% of the project budget for a fully custom home. It sounds like what you really need/want is someone to draw up some plans that you can then take to a structural engineer to get massaged, stamped, and then submit for permit. Can you find some boiler-plate plans online that you like and then have a local structural guy tweak them for your municipality? That should be a lot cheaper and easier than going through an architect. Your builder should be able to work with the structural engineer to help you make any tweaks you want to the plans. if you have any questions about the process, fire away of feel free to DM me. |
|
09-23-2022, 10:16 PM | #15 | |
Lieutenant Colonel
3523
Rep 1,754
Posts |
Quote:
|
|
Appreciate
0
|
09-23-2022, 10:31 PM | #16 | |
Space Force - 4 Star General
11499
Rep 3,265
Posts |
Quote:
We totally underestimated the cost and complexity of building in our specific municipality. Now the OP here may well be in a part of the country that's like "Hey, it's your land, go for it." But in our case the red tape and other bullshit requirements are going to easily add $300,000 to the project before a single nail is driven into the house. |
|
Appreciate
1
Tyga113523.00 |
09-23-2022, 10:52 PM | #17 | |
Lieutenant Colonel
3523
Rep 1,754
Posts |
Quote:
|
|
Appreciate
0
|
09-24-2022, 12:40 PM | #18 |
Brigadier General
5065
Rep 3,859
Posts |
Anyone who has anything to do with construction is slammed right now. Residential, commercial, industrial, you pick the industry. Add to the fact that they can barely keep up with their current workload due to a labor shortage. As a nation, we are building at a record pace and that pace is unsustainable given the current and predicted future economic environment. After an inevitable slowdown, it may be a little easier to nail someone down to a project, but who knows when that will be.
I hate to be a downer, but it's about the worst time ever to start a large scale, ground up residential dwelling. |
Appreciate
1
vreihen1620860.50 |
09-24-2022, 09:08 PM | #19 |
BMW Owner Since 1971
2526
Rep 1,520
Posts
Drives: 1964 700 Sport Cabriolet
Join Date: Apr 2014
Location: Central Virginia
|
My degree (from 46-years ago) is a BS in Architecture. I've never practiced and would have had to spend two-more years in Grad School, or "sit" for an architect as an apprentice before I could have been licensed. Too much money and I already had too much student debt.
We bought land (6-acres) over 34-years ago when our oldest was 2yo, to build our dream house just down the street from our first house. It took us 32-years to be comfortable enough with the cost to actually get around to building our dream house. We had plenty of sketches that evolved over the years. We focused on design/build firms to give us estimates over ten-years ago and came up with figures that were easily three-times what we figured our cost-per-square-foot should have been. We finally sucked it up and figured we would have to spend at least twice what we wanted to get what we wanted. Several builders said our design had too many corners, and that a square plan would be cheaper. I asked them to give me the extra cost of each corner so I could decide which ones to vacate. Never got a straight answer. Several friends in the business of high-end design/build told me they charged so much that they would not recommend their firm to do our house. They had plenty of wealthy customers who were willing to pay whatever they asked. So we paid one design build guy to take our plans and turn them into construction drawings so we could get a real quote. When he was done it was, again, three-times what we wanted to spend. So we asked for the plans, for which he charged us $2,000 for the time and consult, and then put me in touch with his structural guy to get the digital "drawings" from him. That designer told me what I'd paid for were not complete construction drawings and in fact they had no basement plan or structural drawings. I took what I had to a retired contractor a county away who had built several nice homes in our area in the past and was recommended by one of my co-workers. Alan looked over the plans and said he could probably build the house himself with his son for about 2/3rds or less than our other bids, but he'd have to update his CAD program and completely re-do the plans, which he would include in his estimate. He sent me a viewer to view the structural plans in 3D and the quote from the fabrication shop which would supply the trusses from the CAD output. We agreed to pay him directly monthly on work completed and also agreed that we would discuss any increases in any portion of the project prior to moving on, and also any savings would reduce the amount we would owe. I worked with the builder and his son at least one-day each week and the project was literally a 5-minute walk from where we lived at the time. He handled the well and septic and all inspections and permits. Our hydrologist was from the country and doubled as our well-driller, perc-tester, and water tester. When it came to cabinetry our contractor found a supplier of knocked-down kits of quality solid-woods from China that he said would save us around $20k over our construction bids in our quote from Lowe's for Virginia-made cabinetry. I found a hardwood floor contractor who came from 80-miles away but who could supply the 4-inch White Oak I wanted, and paid for that out of pocket. I found bathroom vanities from China direct from the California importer who promised he could beat Home Depot and Lowe's pricing on the same pieces and include shipping direct to our project. The quality was fantastic and they were air-freighted from LAX to Dulles and trucked 100-miles to our site at no charge. Even my contractor was impressed. Our windows came from a Virginia manufacturer and were gas-filled with all the latest U-factor and heat-gain ratings but at probably less than 1/4 the cost of what the local contractors quoted for windows. The masons who did our foundation were family members from over in "The Valley" where craftsmanship and integrity seems to be more important than price. They were superb. My contractor said he had a hard time finding his other subs as many were either dead, drunk, or retired, so we waited on the framers—and waited—until my contractor started on the first floor saying he would not do the second floor. Then we waited until he said he'd frame the second floor—but not the roof! Then he hired some framer helpers and one of my good customers supplied his best crane operator to lift the trusses in place. An amazing skill to be able to place these so perfectly for the crew hanging-on 30-feet above the walk-out basement to hammer them in-place. Roofers were a Mexican family that came by in the evening after their other work, sometimes working in the dark with headlamps while their kids did their homework or played soccer down below. Mostly architectural shingles but hand-formed metal for the front porch and four dormers. Exterior is Hardy plank and board-and-batten painted on-site with three coats of Benjamin Moore colors chosen by my daughter. Concrete was supplied from two-counties away much cheaper than local, and the finishers were also from the Shenandoah Valley and were a pleasure to work with. I enjoyed working with all of them and always brought lunch for the crew on my day off which I spent working on-site. It was a great experience! We started in November during one of the rainiest years on record and had to move a lot of earth and trees due to slope, drain-field, and to get the mountain view we knew was there 30-years before. The excavator was another friend of my contractor and he was the first to show up to dig the foundation. It took until February over a year later to get the occupancy certificate. This was a 3-bed, 2.5-bath house, two-stories with master suite on ground floor, large deck off the back and large front porch. We had a 2-1/2 car garage with two 24x24 bays and a right-angle motorcycle section today holding three bikes with plenty of work space for tool boxes and benches. The basement is a full basement with walk-out double man-door big enough to get my small cars and more bikes inside. Two heat-pumps with LP heat for the first floor, and a very efficient LP fireplace capable of keeping the whole house above 60º for a week-long power-failure during our second winter. We have unfinished spaces above the garage for a future apartment, and an unfinished "bonus" room upstairs above the master suite capable of being another small suite. Hardwood floors finished on-site everywhere but porcelain tile in the laundry and all three bathrooms. Six-foot-wide shower in the master bath with a 6-foot soaking tub. Five and a half foot bath upstairs. All together I think we hit 2,400 finished square-feet plus the full basement, two large unfinished spaces and a big garage. All quality LED lighting from an electrical contractor who was fantastic to work with, also. Some CAT6 runs, double breaker panels, etc. Sixty-something lighting fixtures. No ceiling fans because I hate them and don't need them even with 9-ft ceilings downstairs, 8 upstairs, and 15-foot cathedral ceiling in the open living room. All building supplies came from a Shenandoah Valley supplier with the most beautiful quality 2x4s I've ever seen coming from Austria and our 2x6s coming from Sweden. Insulation is sprayed foam. I think the total cost was around $460,000 in 2019. Our original estimates four-years prior had been around $750,000. Our original pipe-dream was to be around $250,000! We paid in cash since no one wanted to give us a construction loan even though we owned the lot valued at $350,000. We did take out a HELOC on our old house just to give us the flexibility in case we ran over our savings. There were no cost over-runs and we came in under budget, albeit with me paying out of pocket for the hardwood floor, fireplace, and vanities, though those were all under our original line-item-cost estimates. Everyone tells me we built at just the right time, but it didn't feel that way at the time. Material costs were crazy, and kept going up, though we really didn't experience the supply-chain issues of today. Doing it again, I'd change a few minor things but we love the house and have enjoyed it for over three-years. Last edited by BMWCCA1; 09-25-2022 at 09:42 AM.. |
09-24-2022, 10:40 PM | #20 | |
First Lieutenant
406
Rep 380
Posts |
Quote:
Material shortages are still a concern. Escalation may have slowed a bit, but only just recently. We broadly saw 1.5% cost increases month over month for large scale projects most of the year. Clients that tried to value engineer to save cost ended up having a larger price increase and still have to make qualitative and quantitative changes to start their project. There are some materials out there that are coming with no firm price or schedule and include an undefined mandatory change order. I’ve practices for nearly 30 years and have not experienced anything like this. If you want to make a project happen you will need to plan ahead six months to a year to start design with any strong firm. We do some residential but mostly only for our current commercial clients. To the OP be patient and look for the right partner and be prepared to wait if you want to move on this sooner than later. Sounds counterintuitive I know. And all the solid advice on here regarding cost and durations is based on reality right now, for residential anyway unfortunately. I hope everything turns out great for your project, even though the journey is likely to be bumpy.
__________________
|
|
Appreciate
0
|
09-26-2022, 11:34 AM | #21 |
Lieutenant General
7552
Rep 11,936
Posts
Drives: MY24 G01 AW Msport
Join Date: Feb 2008
Location: L.I. NY
|
i work side by side with Architects.
you will need architect that does more residential then commercial. you can go to the county office, see what architects have build homes recently. |
Appreciate
1
whyzee1251996.50 |
09-26-2022, 02:26 PM | #22 |
Brigadier General
4475
Rep 3,365
Posts |
|
Appreciate
0
|
Post Reply |
Bookmarks |
|
|